Back to Case Studies

Steel Frame Installation (Stirling)

ILIFT were contracted in to offload, transport and install 2 Nr. 3.5m high steel goal frames in Stirling.With the surrounding ground area being so soft, this was the ideal job to show how versatile the Hooka is with its mobility using the tracks.We off loaded the steel at the front of the house and tracked it around to the back of house with ease.

You must enable javascript to view this website